1. Pool Locker Room Project:
- repair the leaking large pool
- resurface both pools
- replace under water lighting
- replace flooring and showers in locker rooms
- replace rusting doors
- modernize office spaces
- create ADA access into Field House
- replace rusted bleachers
- repaint main beams in pool area
- replace damaged wood in ceiling areas
Contractor: Beacom Construction, Fortuna, CA
Architect: David Pierce, Ferndale, CA
|
|
Replace stained & missing ceiling tiles |
|
|
replace damaged wood in ceiling areas |
|
|
Replace stained & missing ceiling tiles |
|
|
replace damaged wood in ceiling areas |
|
|
Boiler Line Repair |
|
|
|
Large pool supply line (interior) |
|
|
Large pool supply line (exterior) |
|
|
Accessing large pool supply line |
|
|
New ceiling tiles & painted beams |
|
|
Old lights in pool |
|
|
|
Rusting door in pool area |
|
|
Forms for new concrete seating in pool area |
|
|
Shower room in demolition stage |
|
|
ADA ramp in Field House |
|
|
New flooring being installed |
|
|
|
New painted wall pool area |
|
|
New wall board in pool area |
|
|
Small pool grills' rebar |
|
|
2. Gym Floor/Bleacher replacement:
- replace Tartan Gym floor with wood
- create ADA access to Gym
- resurface all bleachers
- motorize bleachers
- create ADA seating areas in bleachers
- replace score boards with wireless units
- replace rusted doors
Contractor: Dinsmore Construction, Hydesville, CA
Architect: TLDC, Santa Rosa, CA
|
|
Starting the Gym floor work |
|
|
Working on the ADA doors |
|
|
New wood gym floor material |
|
|
New wood floor being installed |
|
|
New wood floor being installed |
|
|
3. Del Norte Campus:
-Ceramics Lab Remodel
|
|
Electrical service conduits in floor
Ceramics Lab, Del Norte (2005) |
|
|
Exterior, new floor drain
Del Norte (2005) |
|
|
Exterior, new floor drain
Del Norte (2005) |
|
|
New floor drain in Ceramics Lab
Del Norte (2005) |
|
|
New electrical service to Kiln
Del Norte (2005) |
|
|
|
New floor drain exterior
Ceramics Lab
Del Norte (2005) |
|
|
Primer trap for new floor drain
Ceramics Lab
Del norte (2005) |
|
|
Painting (2005) |
|
|
Painting (2005) |
|
|
Painting (2005) |
|
|
|
Painting (2005) |
|
|
Painting (2005) |
|
|
Painting (2005) |
|
|
ADA Ramp (2005) |
|
|
|